Marine Services and Ship Layups


LGT Marine Services has the largest bollard pull test with a capacity reaching 400 ton. Our Bollard pull positions are very suitable for all kinds of Bollard pull on the ship to get the best result because the current is not strong and the depth of the sea at a distance of 200 meters Bollard is above 15 meters, even more than 20 meters at a distance of 300 meters.


Three dry docks are Available : 165m (L) x 35m (W) x 9m (H), 110m (L) x 28m (W) x 8m (H) and 202m (L) x 39m (W) x 7.2m (H)

LGT Marine Services has a licensed partner for a “Lay up Anchorage operator” by Director General of Sea Transportation Republic of Indonesia is offering a safe and cost effective location of Batam Island, Indonesia, very close to the international hub of Singapore for laying up any  type of vessel for various purpose and duration. We offer four modes of lay ups:

  • Hot lay up (up to 3 months)
  • Warm Lay up (3 – 6 months)
  • Cold lay up (up to 5 years)
  • Long terms (5 years up)



In accordance with recommendations by major classification societies and flag states, preparation for lay-up should preferably be carried out with the vessel’s crew, as they are the ones who know their ship best. LGT can however assist with the whole work from arrival to the lay-up location

Once the vessel is ready, however, LGT Marine Services assist owners with and / or coordinate the following services  – and more – through in-house service providers.

  • Support with documentation to obtain permits from local authorities
  • Safety and security advice
  • Advice on the lay-up process including supply of procedures and checklists
  • Technical management
  • Routine maintenance and preservation
  • Provision of machinery such as heaters, dehumidifiers and other equipment
  • Regular monitoring of the vessel mooring and safe berth
  • Round-the-clock security
  • Comprehensive monthly reports to owners
  • Crew management / crew supply
  • Ship supply services
  • Any other agency or logistics services as requested by the owner
  • Assistance with efficient start-up after the lay-up period